Advanced Engineering Techniques

Client: Advanced Engineering Techniques

System Size
336.5KWp
No. of Panels
897
Estimated Annual Output
265,679KWh

AET is one of South Yorkshires leading subcontract engineering providers, supplying product to a host of major sectors including Road Transport, Coach & Bus, Waste Solutions, Aerial Platforms, Security, Construction Equipment and Rail.

In June 2023, Navitas installed a 336 kWp system at their Head Office in Halfway Sheffield. The project objective was to insulate them against future rising fuel costs and dramatically lower the company’s carbon footprint while promoting their environmental credentials. Whilst we were on site carrying out their annual service, we presented them with one of our free commemorative plaques to display at their visitors entrance, promoting AET’s environmental ethos.

Navitas designed the system consisting of 897 No. Solar Panels, this was predicted to generate 265679 kWh of electricity per year.

Navitas carried out a performance review and service after the first full year of production to find the system had generated a staggering 311524 kWh of electricity over this initial period.

Financial Controller for AET, David said,“We felt that the system was performing far in advance of where we thought it would be and following the first annual service carried out by Navitas, this was confirmed. Our grid electricity usage has dramatically reduced over the past year and our use of clean, home-grown energy shows to our customers that we are very serious about helping to protect the environment wherever we can. Both financially and environmentally this investment was definitely the correct decision. Well done Navitas”.

share this case study

Commercial Case Studies

MPE Engineering Ltd

System Size 34kWp
case_study_MPE

Rotherham Hospice

System Size 62.64KWp
case_study_rotherham02

Grayson (GB) Ltd

System Size 50.00KWp
case_study_grayson02

Sky House Development

System Size 79.20KWp
case_study_SKY02

Pennells Garden Centres

System Size 375kWp
case_study_pgc01

GCL, Chesterfield

System Size 50kWp
case_study_glc01

Stauff UK

System Size 614kWp
case_study_stauff01

MMD Group

System Size 548kWp
news12072023

Get an accurate detailed quotation or an initial estimate

We can provide you with an initial quote (without a site visit) or in depth quotation. Fill out the form with as much or as little detail and we will get a no obligation quote over to you.

  • Certified Engineers
  • Incredible Support
  • Any Scale Projects
  • Nationwide Service
  • Carbon Neutral
  • Continuous Innovation
icon

Receive an accurate quote within 3-5 days when you fill out this form or give us a call: 0114 248 4228

Request A Quote

Commerical Contact Form

We take great pride in everything that we do, control over products allows us to ensure our customers receive the best quality service.

Who will we deal with?:
How many systems will be required:
System completed by?:
Business Name:
* Your Name:
* Email Address:
* Address:
Anything you would like us to know: