Manchester City Council (Morgan Sindall)

System Size 920.6kWp

System Size
920.6KWp
No. of Panels
2190
Estimated Annual Output
689,559.36KWh

Navitas Solar Installations Ltd completed this immense installation at Hammerstone Road, Manchester, this complete refurbishment of Manchester City Council’s waste disposal and maintenance depot located at the old Gorton Foundry site on Hammerstone Road in Gorton, Manchester, which was once occupied by railway manufacturers Beyer and Peacock who manufactured nearly 8,000 railway locomotives here from 1854 to 1966.

Over 2190 SolarPV Panels (420w) have been incorporated into the design to minimise carbon emissions related to building processes and vehicle charging. To augment this strategy a battery storage solution has been proposed to store renewable energy generated by the PV during peak periods, thus maximising carbon reduction and minimising the technologies payback period.

Working closely with our colleagues at Morgan Sindall Construction, Navitas delivered this 920.6kWp immense SolarPV installation safely and on-time.

Posted on 6th Aug 2024 15:46:33 by surrect.media

case_study_hammerstone01

MPE Engineering Ltd

System Size 34kWp

System Size
34.12KWp
No. of Panels
91
Estimated Annual Output
25,500KWh

The 34.12kW SolarPV system was installed in 2023 at MPE offices in Dinnington on the Sheffield and Nottinghamshire borders. The aim was to promote an environmentally friendly workplace that was self-supported and efficient to run. Navitas designed the system consisting of 91 No. 375w Canadian Solar Panels and it was predicted to generate 25,419 kWh of electricity per year.

During our annual inspection visit, we have recorded that the system has actually generated 30,297 kWh of electricity over this initial period, which is a great achievement for this first year of production.

Managing Director of MPE, Chris; “Talking to people about our Solar still seems fresh, so we were surprised to hear from Navitas that our first-year review was ready. We knew that our electricity bills had dropped significantly but we were delighted to hear the results of how well the system had actually performed. The system was predicted to be paid for within 4.5 years but based on these results, this will be greatly reduced which is proof the investment was the right decision. Thank you Navitas for your continued support”.

Posted on 13th Jun 2024 16:16:54 by surrect.media

case_study_MPE

Rotherham Hospice

System Size 62.64KWp

System Size
62.64KWp
No. of Panels
160
Estimated Annual Output
54,559KWh

Navitas Solar Installations Ltd recently completed a sensitive installation project at Rotherham Hospice. The installation involved a 62.64kWP solar panel system, consisting of 160 panels, which is projected to produce 54,559 kWh of energy per year.

Given the nature of the establishment, Navitas’ engineers took great care in delivering this installation, showing immense respect and discretion throughout the entire process. The team understood the sensitive environment of the hospice and worked diligently to ensure minimal disruption to the patients and staff.

The installation process was carried out safely and efficiently, adhering to industry standards and regulations. Navitas’ engineers utilised their extensive experience and expertise to ensure that the solar panel system was installed to the highest quality, aiming to maximise energy generation and efficiency.

By choosing to implement solar pv technology, Rotherham Hospice demonstrates its commitment to sustainable practices and reducing its carbon footprint. The installation of this solar panel system is projected to significantly lower the hospice’s energy costs while also providing environmental benefits.

Navitas Solar Installations Ltd is proud to have been trusted with this important project and to have contributed to the ongoing success and sustainability of Rotherham Hospice. The collaboration between Navitas and the hospice showcases the positive impact of renewable energy solutions in sensitive environments.

Posted on 17th May 2024 11:39:10 by surrect.media

case_study_rotherham02

Grayson (GB) Ltd

System Size 50.00KWp

System Size
50.00KWp
No. of Panels
134
Estimated Annual Output
37,250KWh

Navitas Solar Installations Ltd successfully completed a 50kWp solar installation project at Grayson (GB) Ltd, a multi-award-winning supplier of building products for masonry facades. The system comprises 134 solar panels, producing 37,250kWh per year, and includes 3 Tesla Powerwall 2 Battery storage units providing 40.5kW of storage capacity.

Grayson (GB) Ltd, with a rich heritage dating back to 1921, has established itself as the UK’s leading supplier of sundries to main contractors and masonry subcontractors. Committed to sustainability, Grayson incorporated this solar installation as part of their initiative to reduce their carbon footprint and save energy.

Navitas’ experienced team executed the installation with precision and expertise, ensuring seamless integration of the solar panels and battery storage units with Grayson’s facilities. The collaboration between Navitas and Grayson exemplifies how companies can embrace renewable energy solutions to drive environmental sustainability.

By harnessing solar energy and incorporating battery storage technology, Grayson (GB) Ltd not only reduces their reliance on traditional energy sources but also positions themselves as industry leaders in adopting innovative and eco-friendly practices.

Navitas Solar Installations Ltd is proud to have partnered with Grayson (GB) Ltd on this significant project, and together they showcase the positive impact of solar technology in empowering businesses to achieve their sustainability goals while contributing to a greener future.

Posted on 17th May 2024 11:27:22 by surrect.media

case_study_grayson02

Sky House Development

System Size 79.20KWp

System Size
79.20KWp
No. of Panels
220
Estimated Annual Output
66,176KWh

Navitas Solar Installations Ltd recently completed the installation of 44 solar panel systems on the Sky House Development located in Waverley, Sheffield. Each individual property on the development has a 1.8kWP (5 panels) system, which will produce 1504kWh each year.

The sleek and modern designs of these townhouses, built by Sky-House Co., incorporate solar pv technology seamlessly into the structures. Navitas worked closely with the Sky-House team to ensure that the solar panel systems were integrated into the architecture in a way which complemented the overall design aesthetic.

The installation was carried out safely and efficiently by Navitas’ experienced team of solar panel installers. The use of high-quality materials and technology means that the systems are expected to offer optimal performance rates and provide significant annual energy savings for each of the 44 Sky House properties.

Overall, the Sky House Development serves as an exemplary showcase for the combination of modern architecture and innovative renewable energy technology. Navitas is proud to have contributed to this exciting project and looks forward to working on similar developments in the future.

Posted on 17th May 2024 11:08:11 by surrect.media

case_study_SKY02

Pennells Garden Centres

System Size 375kWp

System Size
375.48KWp
No. of Panels
972
Estimated Annual Output
305,247KWh

Established in 1780, Pennells Garden Centres are proud to be one of the oldest plant providers in the nation and a family-owned business.

Across three centres at Cleethorpes, Sleaford & Lincoln; Pennells offer a range of choice over many departments as well as restaurants providing homecooked meals and treats.

Pennells are keen to embrace their “green” credentials which includes resourcing their energy from sustainable sources. Navitas were engaged to design and install SolarPV to each of their three sites to maximise the potential that could be achieved based on the merits of each location. Navitas successfully delivered the projects at each centre without compromising the store opening times and with no disruption to the customer experience.

*(combined across 3no. sites) Cleethorpes, Sleaford & Lincoln

Posted on 22nd Feb 2024 08:35:00 by surrect.media

case_study_pgc01

GCL, Chesterfield

System Size 50kWp

System Size
50KWp
No. of Panels
133
Estimated Annual Output
44,450KWh

GCL PRODUCTS LTD are specialist suppliers of products for groundworks, construction & landscaping.

GCL wanted to give themselves the best possible start at their new premises in Chesterfield; By installing SolarPV they have immediately safeguarded their investment by reducing their exposure to volatile pricing from energy suppliers.

They can now focus delivering on quality and service, nationwide knowing that the majority of their energy costs are secured, furthermore, they have also made great steps towards reducing the carbon footprint of the business.

Posted on 22nd Feb 2024 08:20:20 by surrect.media

case_study_glc01

Stauff UK

System Size 614kWp

System Size
614.62KWp
No. of Panels
1556
Estimated Annual Output
438,000KWh

STAUFF UK Ltd is a member of a global organisation with sales, distribution and service facilities in 18 countries. The Sheffield Based headquarters covers more than 110,000 sq.ft and provides State-of-the-art Distribution Technology and Manufacturing facilities. Stauff UK have around 200 employees achieving turnover in excess of £30M.

Stauff UK are very keen to embrace energy measures in line with their environmental policy and SolarPV provides huge benefits towards reducing their Carbon Footprint whilst also providing great financial returns.

Navitas carefully planned the works to ensure that the facility remained operational throughout the project.

The scheduled works were completed on time despite the onset of winter and during a period of significant rain.

Posted on 22nd Feb 2024 08:01:56 by surrect.media

case_study_stauff01

Advanced Engineering Techniques

System Size 336.5kWp

System Size
336.5KWp
No. of Panels
897
Estimated Annual Output
265,679KWh

AET is one of South Yorkshires leading subcontract engineering providers, supplying product to a host of major sectors including Road Transport, Coach & Bus, Waste Solutions, Aerial Platforms, Security, Construction Equipment and Rail.

In June 2023, Navitas installed a 336 kWp system at their Head Office in Halfway Sheffield. The project objective was to insulate them against future rising fuel costs and dramatically lower the company’s carbon footprint while promoting their environmental credentials. Whilst we were on site carrying out their annual service, we presented them with one of our free commemorative plaques to display at their visitors entrance, promoting AET’s environmental ethos.

Navitas designed the system consisting of 897 No. Solar Panels, this was predicted to generate 265679 kWh of electricity per year.

Navitas carried out a performance review and service after the first full year of production to find the system had generated a staggering 311524 kWh of electricity over this initial period.

Financial Controller for AET, David said,“We felt that the system was performing far in advance of where we thought it would be and following the first annual service carried out by Navitas, this was confirmed. Our grid electricity usage has dramatically reduced over the past year and our use of clean, home-grown energy shows to our customers that we are very serious about helping to protect the environment wherever we can. Both financially and environmentally this investment was definitely the correct decision. Well done Navitas”.

Posted on 21st Sep 2023 13:10:44 by surrect.media

case_study_AET03

MMD Group

System Size 548kWp

System Size
548KWp
No. of Panels
1460
Estimated Annual Output
434,044KWh

MMD are a world leading provider of sustainable mineral processing technologies for mining, quarrying and recycling industries.

They are situated in Derby located over two sites.

Navitas installed two systems with well over half a megawatt of panels all linked to a G100 relay system so that no electricity leaves the site, the local District Network Operator placed the restriction due to the local network upgrade program.

The generation from the addition of the solar is an expected 263,000kWp per year giving guaranteed fuel price costings for decades to come and further enhancing the company’s drive for sustainability.