Sheffield Children’s NHS Foundation Trust

Client: Sheffield Children’s NHS Foundation Trust

System Size
114.54KWp
No. of Panels
249
Estimated Annual Output
91,176KWh

Navitas Solar Installations Ltd recently completed a significant Solar PV installation for Sheffield Children’s NHS Foundation Trust at the Embrace Unit, based at Capitol Court in Barnsley. The project was funded through the NHS Decarbonisation Fund and supports the Trust’s ongoing commitment to reducing carbon emissions and improving energy resilience.

The Embrace Unit provides a highly specialised 24-hour transport service for critically ill babies and children across Yorkshire and the Humber. Operating seven days a week, the service carries out urgent transfers between hospitals across the region and beyond, making reliable energy provision an important part of supporting this vital frontline operation.

By generating clean electricity on site, the new system will help reduce reliance on the national grid, support protection against rising energy costs and contribute to the wider NHS Net Zero journey. The system is expected to provide long-term benefits over its 25 to 30 year lifespan.

Peter Knowles, Director of Estates at Sheffield Children’s NHS Foundation Trust, said:
“This is a really positive step for the Trust and for Embrace. By generating our own electricity on site, we’re reducing our reliance on the grid, lowering costs, and making the service more resilient. Just as importantly, it helps us play our part in reducing carbon emissions.”

Jo Whiston, Lead Nurse at Embrace, added:
“The solar installation is a big step forward for us. During daylight hours, the unit can now run on the energy we generate ourselves, which is a great position to be in for a 24/7 service.”

The installation also creates future opportunities for the Trust, including supporting the transition to electric vehicles and the potential for on-site charging powered by renewable energy.

Navitas Solar Installations Ltd is proud to have delivered this important project for Sheffield Children’s NHS Foundation Trust, helping support a vital healthcare service while contributing to a cleaner, more sustainable future.

share this case study

Commercial Case Studies

MPE Engineering Ltd

System Size 34kWp
case_study_MPE

Rotherham Hospice

System Size 62.64KWp
case_study_rotherham02

Grayson (GB) Ltd

System Size 50.00KWp
case_study_grayson02

Sky House Development

System Size 79.20KWp
case_study_SKY02

Pennells Garden Centres

System Size 375kWp
case_study_pgc01

GCL, Chesterfield

System Size 50kWp
case_study_glc01

Stauff UK

System Size 614kWp
case_study_stauff01

Advanced Engineering Techniques

System Size 336.5kWp
case_study_AET03

MMD Group

System Size 548kWp
news12072023

Get an accurate detailed quotation or an initial estimate

We can provide you with an initial quote (without a site visit) or in depth quotation. Fill out the form with as much or as little detail and we will get a no obligation quote over to you.

  • Certified Engineers
  • Incredible Support
  • Any Scale Projects
  • Nationwide Service
  • Carbon Neutral
  • Continuous Innovation
icon

Receive an accurate quote within 3-5 days when you fill out this form or give us a call: 0114 248 4228

Request A Quote

Commerical Contact Form

We take great pride in everything that we do, control over products allows us to ensure our customers receive the best quality service.

Who will we deal with?:
How many systems will be required:
System completed by?:
Business Name:
* Your Name:
* Email Address:
* Address:
Anything you would like us to know: